Ongoing/Scheduled Detours

All construction schedules and timelines are weather dependent and subject to change without notice.

Cameron County

Centre County

SR 2005 bridge over Sinking Creek SR 2005 bridge over Sinking Creek
  • Scope: Bridge replacement.
  • Construction Timeframe: 5/20/2025 to 11/13/2025.
  • Traffic Control: Detour.
  • Detour Length: 0.6 miles.
  • Detour Implementation Date: 6/3/2025.
  • Anticipated Date Detour to be Lifted: 11/4/2025.
  • Contractor: Nestlerode Contracting Company, Inc.
  • Current Contract: $2,768,511.
Detour map for SR 2005-A01 Detour map for SR 2005-A01

  • Scope: Department force pipe replacement.
  • Construction Timeframe: 00/00/2025 to 00/00/2025.
  • Traffic Control: Detour.
  • Detour Length: 1.9 miles.
  • Detour Implementation Date: 00/00/2025.
  • Anticipated Date Detour to be Lifted: 00/00/2025.
  • Contractor: NA.
  • Current Contract: NA.
Detour map for SR 3009 Detour map for SR 3009

  • Scope: High Speed Interchange Project.
  • Construction Timeframe: 9/4/2024 to 9/6/2030.
  • Traffic Control: Detour.
  • Detour Length: 3.6 miles (long term); 10.6 (short term).
  • Detour Implementation Date: 9/25/2024 (long term); TBD (short term).
  • Anticipated Date Detour to be Lifted: TBD
  • Contractor: Trumbull Corporation.
  • Current Contract: $259,100,850.73.
Long term detour map for SR 80-B18 Long term detour map for SR 80-B18
Short term detour map for SR 80-B18 Short term detour map for SR 80-B18

SR 3010 bridge over Slab Cabin Run SR 3010 bridge over Slab Cabin Run
  • Scope: Bridge restoration.
  • Construction Timeframe: 6/3/2024 to 9/16/2025.
  • Traffic Control: Detour.
  • Detour Length: 2.7 miles.
  • Detour Implementation Date: 6/9/2025.
  • Anticipated Date Detour to be Lifted: 8/15/2025.
  • Contractor: H&P Construction, Inc.
  • Current Contract: $1,445,484.23.
Detour map for SR 504-P36 Detour map for SR 504-P36

T-467 bridge over Fishing Creek T-467 bridge over Fishing Creek
  • Scope: Bridge replacement.
  • Construction Timeframe: 6/9/2025 to 8/27/2025.
  • Traffic Control: Detour.
  • Detour Length: 1.5 miles.
  • Detour Implementation Date: 6/11/2025.
  • Anticipated Date Detour to be Lifted: 8/20/2025.
  • Contractor: Rylind Construction Company, Inc.
  • Current Contract: $1,043,203.88.
Detour map for SR 7224-000 (T467) Detour map for SR 7224-000 (T467)

T-633 bridge over Potter Run T-633 bridge over Potter Run
  • Scope: Bridge restoration.
  • Construction Timeframe: 4/28/2025 to 9/24/2025.
  • Traffic Control: Detour.
  • Detour Length: 5.7 miles.
  • Detour Implementation Date: 5/1/2025.
  • Anticipated Date Detour to be Lifted: 9/17/2025.
  • Contractor: Glenn O. Hawbaker, Inc.
  • Current Contract: $986,986.
Detour map for SR 7218-000 (T-633) Detour map for SR 7218-000 (T-633)

  • Scope: Highway restoration.
  • Construction Timeframe: 10/7/2024 to 10/27/2026.
  • Traffic Control: Detour.
  • Detour Length: 2.4. miles.
  • Detour Implementation Date: TBD.
  • Anticipated Date Detour to be Lifted: TBD.
  • Contractor: Glenn O. Hawbaker, Inc.
  • Current Contract: $8,636,626.
Detour map for SR 26-147 Detour map for SR 26-147

Clearfield County

SR 255 bridge over Muddy Run SR 255 bridge over Muddy Run
  • Scope: Bridge replacement.
  • Construction Timeframe: 3/24/2025 to 10/3/2025.
  • Traffic Control: Detour.
  • Detour Length: 4.4 miles.
  • Detour Implementation Date:  5/27/2025
  • Anticipated Date Detour to be Lifted: 9/12/2025
  • Contractor: Kukurin Contracting, Inc.
  • Current Contract: $1,686,011.
Detour map for SR 2005-A01 Detour map for SR 255-A12

SR 1006 bridge overLick Run SR 1006 bridge over Lick Run
  • Scope: Bridge preservation.
  • Let Date: 5/8/2025
  • Construction Timeframe: TBD.
  • Traffic Control: Detour.
  • Detour Length: 6.5 miles.
  • Detour Implementation Date: TBD.
  • Anticipated Date Detour to be Lifted: TBD.
  • Contractor: TBD.
  • Current Contract: TBD.
Detour map for SR 1006-P46 Detour map for SR 1006-P46

SR 2024 bridge over a branch of Morgan Run SR 2024 bridge over a branch of Morgan Run
  • Scope: Bridge replacement.
  • Construction Timeframe: 8/5/2025 to 9/11/25.
  • Traffic Control: Detour.
  • Detour Length: 5.8 miles.
  • Detour Implementation Date:  8/7/2025.
  • Anticipated Date Detour to be Lifted: 9/4/2025.
  • Contractor: C. H. & D. Enterprises, Inc.
  • Current Contract: $245,632.85
Detour map for SR 2024-A05 Detour map for SR 2024-A05

Clinton County

Elk County

SR 2005 bridge over Sinking Creek SR 2005 bridge over Sinking Creek
  • Scope: Bridge replacement
  • Construction Timeframe: 00/00/2025 to 00/00/2025
  • Traffic Control: Detour.
  • Detour Length: 0.8 miles.
  • Detour Implementation Date: 00/00/2025
  • Anticipated Date Detour to be Lifted: 00/00/2025
  • Contractor: Dean Construction, LLC
  • Current Contract: $1,354,000
Detour map for SR 1005-A01 Detour map for SR 1005-A01

SR 4007 bridge over the West Branch of the Clarion River SR 4007 bridge over the West Branch of the Clarion River
  • Scope: Bridge preservation.
  • Let Date: 5/8/2025
  • Construction Timeframe: 00/00/0000 to 0/00/0000
  • Traffic Control: Detour.
  • Detour Length: 17.9 miles.
  • Detour Implementation Date:  00/00/0000
  • Anticipated Date Detour to be Lifted: 00/00/0000
  • Contractor: TBD
  • Current Contract: TBD
Passenger vehicle detour map for SR 1006-P46 Passenger vehicle detour map for SR 1006-P46
Commercial vehicle detour map for SR 1006-P46 Commercial vehicle detour map for SR 1006-P46

Juniata County

Mifflintown roundabout Mifflintown roundabout
  • Scope: Highway resurfacing
  • Construction Timeframe: 00/00/2025 to 00/00/2025
  • Traffic Control: Detour.
  • Detour Length: 8.6 miles.
  • Detour Implementation Date: 00/00/2025
  • Anticipated Date Detour to be Lifted: 00/00/2025
  • Contractor: TBD
  • Current Contract: TBD
Detour map for SR 1005-A01 Detour map for SR 1005-A01

SR 22 eastbound on-ramp SR 22 eastbound on-ramp
  • Scope: Bridge rehabilitation.
  • Construction Timeframe: 4/1/2025 to 9/29/2025
  • Traffic Control: Detour.
  • Detour Length: 1.6 miles.
  • Detour Implementation Date: 4/15/2025.
  • Anticipated Date Detour to be Lifted: 9/19/2025.
  • Contractor: Jay Fulkroad & Sons, Inc.
  • Current Contract: $4,361,430
Detour map for SR 22-P63 Detour map for SR 22-P63

SR 333 bridge over a tributary of the Juniata River SR 333 bridge over a tributary of the Juniata River
  • Scope: Bridge replacement.
  • Construction Timeframe: 7/24/2025 to 9/3/2025.
  • Traffic Control: Detour.
  • Detour Length: 1.7 miles (Passenger vehicles); 9.7 (Commercial Vehicles).
  • Detour Implementation Date: 7/28/2025.
  • Anticipated Date Detour to be Lifted: 8/25/2025.
Detour map for SR 333-A10 Detour map for SR 333-A10

SR 2003 bridge over Doe Run SR 2003 bridge over Doe Run
SR 2006 bridge over Delaware Creek SR 2006 bridge over Delaware Creek
  • Scope: Bridge rehabilitation project impacting a Route 2003 bridge spanning Doe Run and a Route 2006 bridge spanning Delaware Creek.
  • Construction Timeframe: 5/27/2025 to 11/13/2025.
  • Traffic Control: Detour.
  • Detour Length: 4.4 miles (Doe Run); 6 miles (Delaware Creek).
  • Detour Implementation Date: 6/2/2025.
  • Anticipated Date Detour to be Lifted: 11/4/2025.
  • Contractor: Rylind Construction Company, Inc.
  • Current Contract: $5,023,025.
Detour map for SR 2006-P44 bridge over Doe Run Detour map for SR 2006-P44 bridge over Doe Run
Detour map for SR 2006-P44 bridge over Delaware Creek Detour map for SR 2006-P44 bridge over Delaware Creek

SR 3008 bridge over a tributary of Tuscarora Creek SR 3008 bridge over a tributary of Tuscarora Creek
  • Scope: Bridge replacement.
  • Construction Timeframe: 3/17/2025 to 6/30/2025
  • Traffic Control: Detour.
  • Detour Length: 6.2 miles.
  • Detour Implementation Date: 6/25/2025.
  • Anticipated Date Detour to be Lifted: 8/26/2025.
  • Contractor: Wen-Brooke Contracting, Inc.
  • Current Contract: $684,013.
SR 3008-A03 detour map SR 3008-A03 detour map

McKean

  • Scope: Highway resurfacing on Route 1006 (McCrae Brook Road).
  • Construction Timeframe: 00/00/2025 to 00/00/2025
  • Traffic Control: Detour.
  • Detour Length: 12.5 miles.
  • Detour Implementation Date: 00/00/2025.
  • Anticipated Date Detour to be Lifted: 00/00/2025.
  • Contractor: TBD
  • Current Contract: TBD
2-25-ST6 detour map 2-25-ST6 detour map

SR 346 bridge over Gates Hollow Run SR 346 bridge over Gates Hollow Run
  • Scope: Bridge replacement.
  • Construction Timeframe: 5/8/2025 to 8/4/2025
  • Traffic Control: Detour.
  • Detour Length: 1.2 miles.
  • Detour Implementation Date: 7/7/2025.
  • Anticipated Date Detour to be Lifted: 7/29/2025.
  • Contractor: Bob Cummins Construction, LLC.
  • Current Contract: $1,438,734.30
SR 346-A09 detour map SR 346-A09 detour map

SR 1011 bridge over Fowler Brook SR 1011 bridge over Fowler Brook
  • Scope: Bridge replacement.
  • Construction Timeframe: 7/22/2025 to 8/28/2025.
  • Traffic Control: Detour.
  • Detour Length: 6.2 miles.
  • Detour Implementation Date: 7/24/2025.
  • Anticipated Date Detour to be Lifted: 8/21/2025.
  • Contractor: Bob Cummins Construction, LLC.
  • Current Contract: $403,361.
SR 1011-A05 detour map SR 1011-A05 detour map

Mifflin County

SR 2004 bridge over Jack's Creek SR 2004 bridge over Jack's Creek
  • Scope: Bridge replacement.
  • Construction Timeframe: 4/7/2025 to 8/20/2025.
  • Traffic Control: Detour.
  • Detour Length: 5.97 miles.
  • Detour Implementation Date: 7/10/2025.
  • Anticipated Date Detour to be Lifted: 8/8/2025.
  • Contractor: Glenn O. Hawbaker, Inc.
  • Current Contract: $498,498.
SR 2004-A04 detour map SR 2004-A04 detour map

Potter County

  • Scope: Highway resurfacing on Route 1010 (Genesee Mills Road/Marsh Creek Road).
  • Construction Timeframe: 00/00/2025 to 00/00/2025.
  • Traffic Control: Detour.
  • Detour Length: 9.6 miles (Genesee Mills Road); 10 miles (Marsh Creek Road).
  • Detour Implementation Date: 00/00/2025 (Genesee Mills Road) 00/00/2025 Marsh Creek Road.
  • Anticipated Date Detour to be Lifted: 0/00/2025 Genesee Mills Road 00/00/2025 Marsh Creek Road.
  • Contractor: TBD
  • Current Contract: TBD
2-25-ST6 detour map 2-25-ST6 detour map

SR 244 bridge over Oswayo Creek SR 244 bridge over Oswayo Creek
  • Scope: Bridge reconstruction.
  • Construction Timeframe: 3/3/2025 to 10/17/2025
  • Traffic Control: Detour.
  • Detour Length: 21.4 miles.
  • Detour Implementation Date: 3/21/2025.
  • Anticipated Date Detour to be Lifted: 3/25/2025.
  • Contractor: John Nastase Construction.
  • Current Contract: $1,950,787.
SR 244-P43 detour map SR 244-P43 detour map

SR 4025 bridge over Brizzie Hollow Run SR 4025 bridge over Brizzie Hollow Run
  • Scope: Bridge replacement.
  • Construction Timeframe: 3/24/2025.
  • Traffic Control: Detour.
  • Detour Length: 14.9 miles.
  • Detour Implementation Date: 4/14/2025.
  • Anticipated Date Detour to be Lifted: 8/11/2025.
  • Contractor: Twin Tier Constructors, Inc.
  • Current Contract: $1,178,887.
SR 4025-A01 detour map SR 4025-A01 detour map